SN-95 LSX swap build thread
#21
10 Second Club
Thread Starter
iTrader: (9)
Join Date: Jan 2004
Location: Daytona Beach, FL
Posts: 560
Likes: 0
Received 0 Likes
on
0 Posts
Removing the glass and cutting the top off is the the preferred method for a lot of builders but, it seems like a lot of extra work when the main hoop can be dropped through the floor pan (through some 2" holes) before it's welded in to access welds on top. It looks like it's coming along well. Are you mixing 1.750" and 1.625" to build that cage?
#37
10 Second Club
Thread Starter
iTrader: (9)
Join Date: Jan 2004
Location: Daytona Beach, FL
Posts: 560
Likes: 0
Received 0 Likes
on
0 Posts
Factory Shifter Hole Delete
Aerospace Manual Brake Conversion
Brake Pedal
Making Clearance for 7.25" Backspaced Rims
Sheetmetal Work in Wheel Well
Sheetmetal Work in Wheel Well
Team Z Lower Brace
UPR Anti Roll Bar
ARC 12 Switch Panel
Switch Panel Mounted to Cage
Relay Board
Trunk Floor Removed
Interior View