Forced Induction Superchargers | Turbochargers | Intercoolers

Turbo almost done...

Thread Tools
 
Search this Thread
 
Old 04-03-2009, 08:41 PM
  #1  
TECH Fanatic
Thread Starter
iTrader: (25)
 
dreamls1's Avatar
 
Join Date: Sep 2006
Location: Bloomington, illinois
Posts: 1,051
Likes: 0
Received 3 Likes on 3 Posts

Default Turbo almost done...

I am almost ready to start up the car. I have my oil feed done. I need a little help with the drain. Where is the best place to put the 3/8 fitting what should I use to make sure it sealed good? Pictures please!!!!!!
Old 04-04-2009, 08:18 AM
  #2  
TECH Fanatic
Thread Starter
iTrader: (25)
 
dreamls1's Avatar
 
Join Date: Sep 2006
Location: Bloomington, illinois
Posts: 1,051
Likes: 0
Received 3 Likes on 3 Posts

Default

please help. I am taping today
Old 04-04-2009, 08:54 AM
  #3  
Teching In
iTrader: (1)
 
dadkins's Avatar
 
Join Date: Mar 2005
Posts: 46
Likes: 0
Received 0 Likes on 0 Posts

Default

We use 1/2 stainless dryer gas line for most of our Turbo builds.
3/8 is a bit small for good drainage.
The placement in the pan needs to be above the oil level.
Make sure its between the bolts.
Old 04-04-2009, 09:19 AM
  #4  
TECH Fanatic
Thread Starter
iTrader: (25)
 
dreamls1's Avatar
 
Join Date: Sep 2006
Location: Bloomington, illinois
Posts: 1,051
Likes: 0
Received 3 Likes on 3 Posts

Default

No it not 3/8 it 3/8 NPT totaly different. It's -10 drain line. Anyone with pics please.
Old 04-04-2009, 11:06 AM
  #5  
TECH Veteran
iTrader: (3)
 
MY99TAWS6's Avatar
 
Join Date: Apr 2002
Location: Kelowna,BC
Posts: 4,719
Likes: 0
Received 3 Likes on 3 Posts

Default

Go to aps website. Look in instructions for aps kit for f body. They show where you drill to put in the oil drain fittings. Should work for you .




All times are GMT -5. The time now is 09:07 AM.