They said it couldn't be done....
#76
Staging Lane
That is looking really awesome!! Good job man! I give you many thumbs up on having the patience to do this even with all the criticism. Keep up the great work. The end is near.
#77
Tip of the morning. Making -AN fittings. Cut the line to needed length. Fray out the stainless. Install the olive. Use a wrench to hold the olive and push down on the line. Pull the olive off. Use an angle grinder to cut the stainless steel braiding down. This step alone will save you 45 minutes by not using a pair of ******* dikes to trim. Reinstall the olive and pull the jam nut up. Put the end with the hose in a vise and clamp the jam nut. Step on the braided line and tighten the fitting down.
It took me two hours to do 2 fittings. 15 minutes each to do the last two fittings. Got the transmission lines done though.
It took me two hours to do 2 fittings. 15 minutes each to do the last two fittings. Got the transmission lines done though.