My build (truck/C6 manifold setup)
#47
The waste gate needs to be mounted in such a way that it is feed (pressurized by both runs of the Charge pipe. The way you have it is getting pressureized by only one side of the charge pipe. You could put it right at the intersection of the merge and then make a quick 90* turn to move the gate for clearance.
example:
example:
#49
Thanks, I thought of that & it does get pressure from both sides I would think. I positioned it high enough up so it would be after the merge transition, the merge is very long. The fact that I tapped into the side though I'm not sure if it will affect it, what do you think?
#50
The posistion + the down ward angle of the gate is the issue. The gate needs to be horizontal with or upswept with the direction of airflow for optimum effect.
try the link below. It explains it better than I can.
http://www.turbosmartonline.com/inde...ownload&id=213
try the link below. It explains it better than I can.
http://www.turbosmartonline.com/inde...ownload&id=213
#51
The posistion + the down ward angle of the gate is the issue. The gate needs to be horizontal with or upswept with the direction of airflow for optimum effect.
try the link below. It explains it better than I can.
http://www.turbosmartonline.com/inde...ownload&id=213
try the link below. It explains it better than I can.
http://www.turbosmartonline.com/inde...ownload&id=213
Thanks I'm just gonna bite the bullett and fill graft in a plate, block off the old spot and relocate it to the center. I dont want any problems and really appreciate you guys bringing that to my attention.