Those that have purchased a Denny's driveshaft, how long did it take to build?
#5
TECH Junkie
iTrader: (9)
Join Date: Dec 2001
Location: WA
Posts: 3,326
Likes: 0
Received 0 Likes
on
0 Posts
With the Nitrous Ready shaft, it will likely depend on how far they're behind. Mine took about 4 weeks. The MMC shaft (assuming you can use an off-the-shelf size) may take much less time. Denny should be able to give you an idea when you call. They're VERY thorough.
#6
Ive got terrible news!!! I just got off the phone with Denny's Driveshaft and I was told that the nitrous ready will not work with my 10 bolt!!! I wasnt talking to Denny himself, but someone from there. Is this true? I certainly dont want to buy a steel one now, then have to sell it later, and then buy the nitrous ready when I purchase a 12 bolt. I really wanted to hold off on the 12 bolt until the 10 bolt broke. Ill be running a 200-4R and from all that Ive heard and read, it will last longer in an automatic. I really dont want to buy a 12 bolt just so that I can get the nitrous ready. Everyone on here was recommending me the nitrous ready, are all of you running a 12 bolt or 9"? I was all excited about ordering one, now I have to wait until I decide. So if someone can verify, does the nitrous ready work with a 10 bolt? If not, why? Thanks