kick_*ss
05-16-2012, 01:01 PM
Just finished up this morning installing the intake,fuel rails,injectors and TB this morning.
Hopefully I will have the silicone tubing to connect up the tb to chrome air intake tube and tube to air box. "supposed to be delivered today"
VRX5 CAM
102 Fast LSXr (this was such a joy to install, who needs skin on their knuckles?)
102 TB Mike something something
Ls2 fuel rails w 36lb injectors
All that was added on top of this stuff.
Trickflow 220 heads
Meizer Electric water pump
ASP Pulley on Crank
FLP Long tube headers
No MAF
Textralia racing clutch/tranny good to 800 hp
4.11 Rear End Gears
I can't wait to fire her up and get it out and dyno/road tuned.
Should be a beast.
Hopefully I will have the silicone tubing to connect up the tb to chrome air intake tube and tube to air box. "supposed to be delivered today"
VRX5 CAM
102 Fast LSXr (this was such a joy to install, who needs skin on their knuckles?)
102 TB Mike something something
Ls2 fuel rails w 36lb injectors
All that was added on top of this stuff.
Trickflow 220 heads
Meizer Electric water pump
ASP Pulley on Crank
FLP Long tube headers
No MAF
Textralia racing clutch/tranny good to 800 hp
4.11 Rear End Gears
I can't wait to fire her up and get it out and dyno/road tuned.
Should be a beast.