Silly stock heads and street wheels combo
#25
12 Second Club
#33
TECH Fanatic
iTrader: (2)
Join Date: Dec 2010
Location: Oklahoma
Posts: 1,084
Likes: 0
Received 0 Likes
on
0 Posts
That was start to finish; Doing the install and everything. I don't like to rush through things. Besides if you are installing on a stockish vehicle then you need other things like fuel pump install. Properly running oil lines and tucking things neatly out of sight; plus cleaning things up... ya 9-12 hrs from start to finish with everything clean including the area you were using isn't too far off.