wanna make some money? i need some help
#1
On The Tree
Thread Starter
iTrader: (1)
Join Date: Nov 2011
Location: PEARLAND, TX
Posts: 153
Likes: 0
Received 0 Likes
on
0 Posts
wanna make some money? i need some help
i just bought a set of pacesetter headers and catless mid pipes for my 05 gto...i hear they are a pain to put in...any one put these in before? does some one wanna make a buck doing mine?
#9
TECH Fanatic
iTrader: (17)
I had to think back to the only one I did over 2yrs ago, quoted the guy $200 and it ended up taking two days and I had to pay another guy to come help me finish... its not bad, just time consuming. Good luck and if all else fails, you're welcome to use my tools and garage and I'll help as much as I can
#12
Teching In
Join Date: Dec 2010
Location: Spring/The Woodlands
Posts: 17
Likes: 0
Received 0 Likes
on
0 Posts
Do you have:
headers
Midpipes, catted or otherwise
Extensions for the front O2 sensors - grey harnesses
At least one extension for the rear O2 sensors - black harnesses
Any required hardware for connecting the midpipes to the headers. Any required hardware for bolting up to your existing cat-back
(2) quarts Dexron III ATF
headers
Midpipes, catted or otherwise
Extensions for the front O2 sensors - grey harnesses
At least one extension for the rear O2 sensors - black harnesses
Any required hardware for connecting the midpipes to the headers. Any required hardware for bolting up to your existing cat-back
(2) quarts Dexron III ATF
#18
TECH Apprentice
Just dedicate an entire day to putting them in and have a buddy help you out. That's what I did, was my first time to install headers on anything. Yes it was a bitch but it was worth the experience and quality time spent with the car.
#19
11 Second Club
iTrader: (5)
Join Date: May 2009
Location: Pittsburgh
Posts: 350
Likes: 0
Received 0 Likes
on
0 Posts
Id take you up on the offer if you were in PA lol. I just installed SLP Longtubes & Catted Midpipe on my buddies 06' GTO. The hardest part is the steering rack bullshit, but it took about 3hrs start to finish.