PROJECT RED ROCKET TUNING HAS STARTED! AES390, Twin turbo, 4l80e. PG21, Post 408! :)
#26
Just a small update, been busy workin.. Im about 80% done putting the motor together. Hopefully start cleaning up the engine bay next week/weekend and get it ready for paint. I need to do the wire tuck on both sides and come up with a bracket for the radiator. Ill do a decent update here soon.
*On a side note, would you guys like if i removed some of the pics from the first page? cuz there is a **** ton i posted. i didnt realize how many there are. Let me know and ill edit if need be!
*On a side note, would you guys like if i removed some of the pics from the first page? cuz there is a **** ton i posted. i didnt realize how many there are. Let me know and ill edit if need be!
#28
thanks x2 lol. I bought this house about 2 months ago and i wanted the garage finished before i bought it. We agreed that the owner would insulate, wire and put lighting up and supply the flooring. all i had to do is buy paint and paint it. so i came out good. it has a window AC unit too so it stays nice and cool when im wrenching on the car. The garage is a 24x24. perfect size for my car.
#30
its about to get the **** cleaned out of it within the next week or so. I ordered a BMR hvac delete panel already. so i should be ready to roll. id lke to get it painted and the wire tuck done so i can get the engine back in the car so i can move it around. Then its.. Finish downpipes/wastegates > Cold Side > Fuel system .
#35
thanks joe! my plan is to run a DP on each side of the block and come out just like my headers did so i can tie it into my true duals. ill know more once the engine is in the car. we could only tab them right off the turbo and that was it because the engine was still sittin on the stock k-member.