Generation III External Engine LS1 | LS6 | Bolt-Ons | Intakes | Exhaust | Ignition | Accessories
Sponsored by:
Sponsored by:

AspPulley Machining

Thread Tools
 
Search this Thread
 
Old 11-02-2003, 10:34 AM
  #1  
8 Second Club
Thread Starter
iTrader: (16)
 
soundengineer's Avatar
 
Join Date: Jul 2003
Location: Chicago IL
Posts: 4,651
Likes: 0
Received 9 Likes on 9 Posts

Default AspPulley Machining

so I'm getting the asp underdrive pulley...and I have an SLP double roller timing chain...and I have been told that it will need to be machined...and I have seen the picture on ls1howto...

does anybody have the amount that I will need to tell the machine shop??
It would be nice to give them a # insted of just a picture.
Old 11-02-2003, 01:22 PM
  #2  
TECH Addict
 
felton316's Avatar
 
Join Date: Nov 2001
Location: TEXAS
Posts: 2,593
Likes: 0
Received 0 Likes on 0 Posts

Default

I machined 3mm off of the pulley




All times are GMT -5. The time now is 02:52 PM.