LT1-LT4 Modifications 1993-97 Gen II Small Block V8

My story : the LT1 Pacesetter LT project

Thread Tools
 
Search this Thread
 
Old 09-27-2008, 12:17 AM
  #1  
On The Tree
Thread Starter
 
dante1313's Avatar
 
Join Date: Feb 2008
Posts: 151
Likes: 0
Received 0 Likes on 0 Posts
Default My story : the LT1 Pacesetter LT project

lt1 pacesetter project is taking forEVER!!!
it has been two nights
one main header bolt on passenger side still on. stripped..( how do i get this off)
and another small bolt near transmission tube. (taking forever to get off)

Good note
DRIVER SIDE IS DONE!!!!

I know i am going slow, but this is my first time ever doing somehting like this.

Took off on passenger side.
Starter
Alt.
S belt.
^^Should header slide through???

I don't think i forgot anything to say, if so ill edit.
Old 09-27-2008, 12:19 AM
  #2  
12 Second Club
iTrader: (129)
 
fergymoto's Avatar
 
Join Date: Aug 2005
Location: Rock Hill, SC
Posts: 2,810
Likes: 0
Received 2 Likes on 2 Posts

Default

In my experience the Pacesetters just slide right up in through the bottom.
Old 09-27-2008, 12:24 AM
  #3  
On The Tree
Thread Starter
 
dante1313's Avatar
 
Join Date: Feb 2008
Posts: 151
Likes: 0
Received 0 Likes on 0 Posts
Default

Originally Posted by fergymoto
In my experience the Pacesetters just slide right up in through the bottom.

What is in your car is those vids?
i would love to run those time's.
Old 09-28-2008, 12:42 AM
  #4  
TECH Junkie
iTrader: (17)
 
HoLLo's Avatar
 
Join Date: Aug 2006
Location: Rapid City, SD
Posts: 3,161
Likes: 0
Received 0 Likes on 0 Posts

Default

Driver side was much simpler. It took me and a friend total about 18-20 hours from start to finish across 2 days.




All times are GMT -5. The time now is 06:28 PM.