Automatic Transmission 2-Speed thru 10-Speed GM Autos | Converters | Shift Kits
Sponsored by:
Sponsored by:

PROJECT delayed because of violent shudder!!

Old Jan 21, 2009 | 04:31 PM
  #1  
camaroIroc's Avatar
Thread Starter
Staging Lane
iTrader: (1)
 
Joined: Apr 2008
Posts: 95
Likes: 0
From: Denver/Charlotte
Default PROJECT delayed because of violent shudder!!

hows everyone doing? im doing pretty shi**y.

i have been putting this car together for almost a year now, since i was in college and doing it at the same time..its taking me quite sometime. But i am patient when it comes to expensive investments.

okay moving on, i have a mildly built 5.3L in an old camaro tuned and ready to go. I also have a built 700r4 with trans go stage 2 shift kit, and some other beefed up parts. i went with a Daaco torque converter around 2800-3200 stall. my problem now after driving for a mile or two is shudder, violent shudder. I can almost predict when its going to start, my rpms drop and it trys to stall the engine completely and its rough. I can turn the car off, and wait then start again.... go about a mile and it comes back. my TC solenoid was my first guess...so i removed my toggle switch for it...so that it cant engage at all. i dont want to believe that the tranny is gone, cuz its fairly new. but i cant seem to not think its the torque converter. all the symptoms of my TC slipping and clunking are here to stay.

Sorry for such a long and thorough post, just looking for a long and thorough answer. lol

some tips of what i know as far as right now:
-tcc is disengaged
-TV cable is adjusted right
-have not tested mainline pressure tough
-trans mount is secure
-drive shaft is fine
Reply
Old Jan 21, 2009 | 04:47 PM
  #2  
performabuilt's Avatar
LS1Tech Sponsor
15 Year Member
Liked
Loved
Community Favorite
iTrader: (25)
 
Joined: Aug 2006
Posts: 10,854
Likes: 80
From: BLOOMSBURG PA
Default

if its been setting for a long while its possible the TCC valve in the pump may be sticking
__________________
Built..PerformaBuilt..Tough

Call 888-744-6542


Reply
Old Jan 21, 2009 | 04:49 PM
  #3  
camaroIroc's Avatar
Thread Starter
Staging Lane
iTrader: (1)
 
Joined: Apr 2008
Posts: 95
Likes: 0
From: Denver/Charlotte
Default

what would or should be done first?
Reply
Old Jan 21, 2009 | 05:10 PM
  #4  
performabuilt's Avatar
LS1Tech Sponsor
15 Year Member
Liked
Loved
Community Favorite
iTrader: (25)
 
Joined: Aug 2006
Posts: 10,854
Likes: 80
From: BLOOMSBURG PA
Default

I would remove the TCC solenoid and the remove clean and inspect the tcc valve above it then replace the TCC solenoid
__________________
Built..PerformaBuilt..Tough

Call 888-744-6542


Reply
Old Jan 21, 2009 | 05:11 PM
  #5  
56chevyboy's Avatar
Staging Lane
 
Joined: Jan 2009
Posts: 60
Likes: 0
From: idaho
Default

rear end going out???
Reply
Old Jan 21, 2009 | 05:20 PM
  #6  
camaroIroc's Avatar
Thread Starter
Staging Lane
iTrader: (1)
 
Joined: Apr 2008
Posts: 95
Likes: 0
From: Denver/Charlotte
Default

the rearend is the original from 1986.. 10 bolt 2.73:1

i had a fiend tell me to re-do my rearend with a lower gear and it will make a world of difference.. true? like 3.73 or 4.11
Reply
Old Jan 22, 2009 | 03:39 PM
  #7  
camaroIroc's Avatar
Thread Starter
Staging Lane
iTrader: (1)
 
Joined: Apr 2008
Posts: 95
Likes: 0
From: Denver/Charlotte
Default

daily bump, just want to know about rear end gear... in relation to my problem
Reply


Thread Tools
Search this Thread

All times are GMT -5. The time now is 09:38 PM.

story-0
Topdon ONE vs. Artidiag 800 BT2: Which is the Diagnostic Tablet For You?

Slideshow: We take a close look at the ONE and Artidiag 800BT2 diagnostic tools from Topdon and the reasons to buy one over the other.

By Pouria Savadkouei | 2026-05-28 11:05:11


VIEW MORE
story-1
Gas Monkey Built a 6-Wheel Ferrari Testarossa With a Corvette LT4 Engine

Slideshow: The controversial Ferrari F6 swaps its original flat-12 for a Corvette Z06-derived LT4 V8 and sends power to four rear wheels through a custom-built drivetrain.

By Verdad Gallardo | 2026-05-26 18:23:54


VIEW MORE
story-2
7 Most Reliable High-Performance Engines GM Has Ever Built

Slideshow:These GM engines didn't just make huge power, they survived abuse, boost, track days, and six-digit mileage with a reputation for refusing to quit.

By Verdad Gallardo | 2026-05-21 16:45:27


VIEW MORE
story-3
Amazing '71 Camaro Restomod Is Modern Muscle Car Under the Skin

Slideshow: This heavily modified 1971 Camaro mixes classic muscle car styling with a fifth-generation Camaro interior and modern LS3 power.

By Verdad Gallardo | 2026-05-12 18:06:42


VIEW MORE
story-4
6 Common C5 Corvette Failures and What's Involved In Repairing Them

Slideshow: From wobbling harmonic balancers to failed EBCMs, these are the issues that define long-term C5 ownership and what repairs typically involve.

By Pouria Savadkouei | 2026-05-07 18:44:57


VIEW MORE
story-5
Retro Modern Bandit Pontiac Trans AM Comes With Burt Reynolds' Autograph

Slideshow: A modern Camaro transformed into a retro icon, this limited-run "Bandit" build blends nostalgia with brute force in a way few revivals manage.

By Verdad Gallardo | 2026-04-21 13:57:02


VIEW MORE
story-6
Top 10 Greatest Cadillac V Series Performance Models Ever, Ranked

Slideshow: Cadillac didn't just crash the high-performance luxury vehicle party, it showed up loud, supercharged, and occasionally a little unhinged...

By Pouria Savadkouei | 2026-04-16 10:05:15


VIEW MORE
story-7
Top 10 Most Powerful Chevy Trucks Ever Made!

Slideshow: Top ten most powerful Chevy trucks ever made

By | 2026-03-25 09:22:26


VIEW MORE
story-8
Hennessey's New Supercharged Silverado ZR2 Has 700 HP

Slideshow: Hennessey has turned the Silverado ZR2 into a 700-hp off-road monster with supercharged V8 power and a limited production run.

By Verdad Gallardo | 2026-03-24 18:57:52


VIEW MORE
story-9
Coachbuilt N2A Anteros Is an LS2-Powered C6 Corvette In Italian Clothes

Slideshow: A one-off sports car that looks like a vintage Italian exotic-but hides a C6 Corvette underneath-just sold for the price of a new mid-engine Corvette.

By Verdad Gallardo | 2026-03-23 18:53:41


VIEW MORE