Harness testing, what on engine gets ingn voltage.
02 sensors
Coil pack connector
Injectors
Next test all of the grounds, both PCM and sensor like MAf and HO2s
Next, test the IGN wires to the fuseblock with all the fuses still in. All should be connected with the fuses in. Once those check out, pop each fuse one at a time and ensure the grouping is correct for what you've built. Example being, I like to put the PCM batt/fuel pump to #1, PCM/MAF IGN to #1, bank 1 #3, bank 2 #4, fans #5, HO2s/trans #6, AC #7, #8 unused
So for that I test that the groups are connected to each other but not to anything else with the fuse out



