help with engine install
here is a picture of it. it should run pretty good once it is back in. has high volume high pressure melling oil pump. comp cams heat treated pushrods. harland sharp rockers. trick flow 215 cnc heads, comp cams 54-444-11 camshaft. new lifters. new oil pan and timing cover gasket and trick flow timing chain.

it also has the fast 90/90 intake tb waiting to go on once the engine is in along with 36 lb/hr fuel injectors and some other little goodies.
i am also putting a new ram clutch in it with new slave and the 1/8" drill mod. the rear end is getting new bearings and seals along witha 4.10 gear ratio.
if you cant tell im anxious to get this car done!
any help or thoughts would be much appreciated.
if this is in the wrong section please let me know.





