Carbon Blocker Ring Help (Installation Information)
We recommend soaking the carbon blocker ring kit for 2 or more hours before you start the assembly process and using a assembly grease on all roller bearings. Now this will be messy but there is a less likely hood of the blocker ring sticking during installation and it will give the blocker ring/bearings the desired lubrication prior to the first use of the transmission.
Thanks,
Amber
Six Speeds Inc.


