2 stage plumbing question
#1
TECH Senior Member
Thread Starter
iTrader: (9)
Join Date: Aug 2003
Location: Cleveland Mississippi
Posts: 6,204
Likes: 0
Received 0 Likes
on
0 Posts
2 stage plumbing question
Ok, I've got most of the parts needed for my two stage setup(both wet). Currently I have the basic nozzle setup with noids(my 50shot off the line due to traction problems) and the NOS brand plate system with the NOS super pro noids(150shot). I'm running the -6AN feed line. I'm basically just trying to figure out the plumbing now. I guess I need a t fitting from the feed line to the two nitrous noids(need to know what fitting to purchase), as well as a t fitting that will split the fuel to each noid. If someone could give me the correct sizes(or better yet part numbers) on the t-fittings, I will be more than greatful.
#2
TECH Senior Member
Thread Starter
iTrader: (9)
Join Date: Aug 2003
Location: Cleveland Mississippi
Posts: 6,204
Likes: 0
Received 0 Likes
on
0 Posts
As always thanks for the quick replies I think I'll just take my kit off of the car and install it on the truck for the first stage........Now all I need is a t fitting for the fuel rail and I'll be set. I'll be able to keep nitrous pressure alot higher and more consistent running the two seperate bottles anyway.