Billet Carrier Caps
#4
LS1Tech Sponsor
iTrader: (22)
Join Date: Mar 2005
Location: 32639 Groesbeck HWY. Fraser MI 48026
Posts: 1,593
Likes: 0
Received 0 Likes
on
0 Posts
Picture 3 CNC stations, station 1 does the left hand differential bore, station 2 does the front and rear pinion bore with seal, and station 3 does the right hand differential bore. The center section is clamped by the cover pan and located by the 2 holes that feed oil into the tubes. Now everything has been finished by cnc but the 5 bores, the finishers all use one insert and cut ellipitical then are air gaged to with in 19 microns. 2 parts are CMM'ed per 8 hours and kept with in a thousand or each other tollerence.