Generation III Internal Engine 1997-2006 LS1 | LS6
Sponsored by:
Sponsored by:

How many hrs to install

Thread Tools
 
Search this Thread
 
Old 02-12-2012, 04:06 PM
  #1  
TECH Enthusiast
Thread Starter
iTrader: (7)
 
JeaneGrae's Avatar
 
Join Date: May 2006
Posts: 678
Likes: 0
Received 1 Like on 1 Post

Default How many hrs to install

A set of 243s and ls6 intake, new coils and injectors. Trying to see how many hours it would be. Ball park with all the right tools available.
Old 02-12-2012, 04:33 PM
  #2  
12 Second Club
iTrader: (6)
 
Schantin's Avatar
 
Join Date: Jun 2004
Location: Ft. Irwin, California (But Virginia is home)
Posts: 1,501
Likes: 0
Received 7 Likes on 1 Post

Default

It depends. i vacuumed the block with a wet-vac to remove coolant before pulling the heads. That saved on cleaning time. But, even so, probably took as long to clean the head bolt holes as to tear-down/reinstall everything else.

I also installed ARP studs. That said, probably had 20hrs labor in the job total. This included a cam swap.
Old 02-12-2012, 05:15 PM
  #3  
Teching In
 
sfc rick's Avatar
 
Join Date: Feb 2011
Location: Huntington, TX
Posts: 39
Likes: 0
Received 0 Likes on 0 Posts
Default

Depends on your skill level. 1st time it took me two work days, second time took a little more than half that.
Old 02-12-2012, 06:03 PM
  #4  
TECH Enthusiast
iTrader: (17)
 
parks450's Avatar
 
Join Date: Oct 2010
Location: Wyoming
Posts: 649
Likes: 0
Received 1 Like on 1 Post
Default

If you have all the tools and do it correctly and have everything already like gaskets, headbolts, etc. if you do depending on skill level I've done them in 5 hours with all the cleaning and scraping old gaskets off. You'll also have to do a oil change so don't forget that.
Old 02-12-2012, 06:16 PM
  #5  
TECH Junkie
iTrader: (1)
 
gMAG's Avatar
 
Join Date: Mar 2003
Location: CT
Posts: 3,028
Likes: 0
Received 4 Likes on 4 Posts

Default

Give yourself a whole day.
Old 02-12-2012, 10:21 PM
  #6  
Teching In
iTrader: (2)
 
yaknow's Avatar
 
Join Date: Feb 2012
Location: Lino Lakes, MN
Posts: 19
Likes: 0
Received 0 Likes on 0 Posts
Default

I thinking about doing this as well, after reading the instructions I'm planning on 2 days
Old 02-14-2012, 08:10 AM
  #7  
TECH Enthusiast
Thread Starter
iTrader: (7)
 
JeaneGrae's Avatar
 
Join Date: May 2006
Posts: 678
Likes: 0
Received 1 Like on 1 Post

Default ........

While I'm in there what else should I replace. I have new coil packs, injectors, ls6 intake, plugs, gaskets and oil. If so please list part number and if you got a good deal somewhere, let me know. Thanks fellas. also what gains can i expect from swapping on these parts and a new tune.
Old 02-14-2012, 09:07 AM
  #8  
10 Second Club
iTrader: (18)
 
dodson55's Avatar
 
Join Date: Nov 2010
Location: monticello, ky
Posts: 490
Likes: 0
Received 1 Like on 1 Post

Default

heads and intake i can do them in bout 4-5 hours



Quick Reply: How many hrs to install



All times are GMT -5. The time now is 08:56 PM.