"SSAWD" Project Camaro
Be Cool polished radiator and spal fans.
carbon fiber glove box door with the quick latch mini installed, and the
ground effects are installed here is the first side profile shot for you.
more soon.
prepped the carbon fiber wing and test fit. had few issues with the front drive shaft
clearing the oil sending unit. very tight fit but I finally got it. thxnx for positive feed back I did not know how everyone would except it had a lot of hater and people telling me we could never make it work I have heard that 1,000 times. So that being said I am so happy to finally start seeing the light at the end of the tunnel. more soon.
Got a lot of stuff to finish up but starting to look like a car at least.
The Best V8 Stories One Small Block at Time
mounted the master and ran brake lines.
installed the machined washer to the shock towers
Mounted the speedster humps
Finished buffing out the paint job.
You can see he tricoat flip flop pearl on the black stripe.
I find the people with the most negative feedback for me or lack of credit where credit is due are the ones who are just jealous that you thought of it first or have the skills to do it and they don't.
Personally, I have found that the best fabricators/craftsman know good work when they see it and are self confident enough in their own skills to compliment another person's skills.
mirrors are test fit.
rear facia and defussor panel installed as are the tail lights.
rear lights are wired up, trunk lid and wing installed..
Finally got the rest of my parts for the 4 link rear end so hope to have that in today.
making up p/s line today and working on wiring.
running the wire for the Dominator Holley EFI system.
Here is a shot of the Holley Dual pump fuel pump twin pumps will handle 1400 hp. more soon.
got the interior all wired up. working on the tail and turn signals almost ready to install int.
more soon.







