65 rusty Nova build
I bent up this bar today to tie together the new spring buckets. This will tie into the rear sliders with a tube frame.
I ran the frame connectors from the main hoop all the way up to where the front stub bolts on.
Trunk plates will be welded to the floor then the sliders will bolt to them.
Rear bar with parachute attachment fabricated and installed.
New tube frame rails installed to tie the new leaf springs to there new location. There will be an upper one installed next.
He is a trucker hauling pork out of the Iowa Pork (I think that's it...) plant in Hospers.
If you ever see a bright yellow Pete pulling a reefer it might be him...
Anyway, have a good one!
Ah, I just looked it up, it was you that told me this a few years ago. I do not know him, Ill keep an eye out for the yellow truck.











