House work done!!!!! (for now)
Yeah I got another promotion, I now supervise 4 departments and come August I will be the "new" Muchkin Contender (wall hung unit) line Supervisor.
Whats the new contender going to be? Are they going to offer a 140 or a 199 wall hung? If we could get the 140 or even better the 199 in a wall hung we would buy a **** load of them!
In the past couple years it seems like the projects never end and our home is only 9 years new. I put on a 600 sq ft deck last summer, and this past winter I redid the kitchen with new countertops and refaced the cabinets.
I look at the car sitting in the garage and have dreams of doing a LS2 402, 12-bolt, new paint job, etc etc etc, but I quickly realilze that I'd rather finish our basement and put in a pool table, 3-tap wetbar, 65" LCD, air hockey and enjoy the house more.
Congrats once again. It looks like you do nice work. Did you sub out any of it or did you do it all yourself?
The Best V8 Stories One Small Block at Time

I'm asking $100 each.
I'm asking $100 each.
I had to have my whole slab torn up and stone and drian pipe layed down and then had concrete poured again. It still smells damnp and my pumps run every 30 seconds but it has stayed mostly dry.
I pressure washed the foundation and put 4 coats of foundation sealer on it... then had foundation drains put in and run 50 feet behind my house & over a bank... then hav 6-7 truck loads of gravel spread on top of that... then another 6-7 truck loads of sand... Problem fixed!
I'm in the process of the outside now on my house and the garage.. it won't be a Tbyrne garage that's for sure, but will serve the purpose... I'll have before and after pic's to post sooner or later... later at the rate it's going with the damn rain
I'm in the process of the outside now on my house and the garage.. it won't be a Tbyrne garage that's for sure, but will serve the purpose... I'll have before and after pic's to post sooner or later... later at the rate it's going with the damn rain

Post up some pics once your garage is done!
I'm hoping that by the end of the week, if the rain holds off the siding will be done, guy's coming this saturday to measure for the door.
I still have to get the driveway done and get the elec. serivce in the house upgraded, and power run out to the garage.. then I can insulate the garage and sheetrock it, but that probably won't happen until next summer I'm guessing, I'm looking at probaby another 5g's to remove the old driceway and put in the new one, and the elec. will probably be 2 grand if not more.. I have 60 amp service now I have to up to at least 100, and I want to run 2 230v circuits to the garage for a welder and a compressor, and a 120 circuit too.. so a pipe will be needed. Probably a phone line and a cable tv line will go in the pipe too while I'm at it, mine as well run them all at once, when I eventually get a new Tv for my living room, I'll move the old one out there. Phone will be nice to have there too, so I don't have to run back in the house to make a call or get it.
Hopefully, I'll have it all done by next spring, but the building itself will be hopefully finished in 2 weeks, door and all... then I'll finally have a place to put the car
Or yeah... just about the time I'm finished with all of this work I'll prob want to go buy a bigger house
tim, looking good, cant wait for the home warming party. tea and crupits??