Just Another JY 5.3 Build......
Yea, the downpipe/merge is getting wrapped!
I picked up my ASP pulley/Hurst 1/4 stick and ordered 80lb injectors/fans and all the intercooler piping yesterday!
Things left to do:
Make oil feed/drain
Install injectors
Wire up fans
Fab coldside
Install shifter
Fill with fluids and hope for the best!
Hoping to have it up and running in next 2 weeks!
The Best V8 Stories One Small Block at Time
Got the injectors in/downpipe wrapped/new coolant hoses and driveshaft put back in, i still need a few more misc. things but im hoping to have it fired up this weekend if everthing gets here in time!
Pics:

Im also still waiting on my IC piping to show up, once it does i can go ahead and throw that together as well.....
Changed my mind on the shifter i wanted, i ended up going with the B&M Pro Ratchet
Mock up pics:

I guess i forgot to hook up the ground wires on the back of the head, all is well and she fire's right up!
I was to excited to remember my camera but i'll get a vid of it tomm!





