My build - Lots of pics
Again, thanks for following along. I think everyone will like what we have in store for this winter

Sean

Let me know if you need anything when you pull yours apart! I am sure you will do it all top notch just like everything else with your car!!
The Best V8 Stories One Small Block at Time
Here you can see the new pipe fitted to the cross over.
And here is the finished product!

Another angle

Unfortunately while Chris was putting the merge back on the car, I started welding the O2 bung onto the down pipe. I had about a 1/8" left to go and we ran out of gas!! Even though we are well ahead of schedule, we would have been much further if it wasn't for that. We were done for the night at about 10 or so, usually we stay out there till 12 or 1. Oh well, we will get back after it next weekend. I think the lower intercooler pipe (from the turbo to the intercooler) is next on the schedule. Next weekend will be short too, but we should make a good sized dent in that piping at least.
As always thanks for following along!!
Sean

Another shot of it

Next we started on the lower intercooler pipe. I wasn't very happy with it last year and since we changed the turbo it gave us a good opportunity to change it. This is what we came up with.



It's hard to see in the pictures, but its 3.5" out of the turbo, it 90's under the frame rail then transitions to 4" for the rest of it.
Once that was done, we moved to the upper intercooler pipe. Its the same story here, I wasn't real happy with it last year so we decided to remake it. It was just a little short last year, but we went with it hoping to get the car out. It worked fine, but we are picky. This is what the new one looks like, the same but the right length. Notice how it lines up at the v-band, perfect!

Lots of room to the down pipe now

That's about all for now. Somewhere in there while I was welding Chris came up with, and made, mounts for the radiator. We need to make up some small tabs, and new standoffs for the radiator before we can install them though. Look for that to be 100% next weekend, along with the water pump which we will probably move. We have to mount the BOV, IAT bung, and a couple other small things then the fabrication is done! Then we get to pull it all apart, send the motor in for a freshen up, all of the tubing and the new turbo will get sent out for coating, and we will clean up the engine bay some. Looks like we are on pace to have the car 100% complete and ready for tuning in December! As always, thanks for following along!
Sean
Better view of finished waste gate and dump tube

Radiator mounts

Radiator mounted

Detail of the radiator mount

Bottom of the finished upper intercooler pipe

Top of the finished upper intercooler pipe

Finished lower intercooler pipe

This is all of the intercooler piping, all finished, just needs coating!

Mostly finished radiator, still need to close up that top hole

That's all for now! Next week everything will be coming out of the car. The piping and turbo housing will be going out to get coated. The motor will be going to Steve Roden at Legend Racing in Schaumburg IL to have some magic worked over on it. While everything is out we are going to do some work to the engine bay. Probably not too much, but something. As always thanks for following along!
Sean
I'm glad people actually read it! Sometimes I figure that people just look at the pics, or don't bother at all.
Sean









