Gears & Axles Driveshafts | Rearends | Differentials | Gears | 12 Bolt | 9 Inch | Dana

Help with Brackets/Tubing for Mini ladder bar setup

Thread Tools
 
Search this Thread
 
Old 01-30-2011, 01:20 AM
  #1  
TECH Enthusiast
Thread Starter
iTrader: (7)
 
mtuggle86's Avatar
 
Join Date: Jul 2008
Posts: 548
Likes: 0
Received 0 Likes on 0 Posts
Default Help with Brackets/Tubing for Mini ladder bar setup

I im planning on doing an 8.8 rear end swap in the next few weeks Im wanting to delete the torque arm and go to the mini ladder bar setup. I was wondering if this stuff would would to put on together.

Threaded Tubing Im not sure How long of a piece I need for the link.
http://www.summitracing.com/parts/AFC-36174/
http://www.summitracing.com/parts/AAF-ALL56607/

Bracket To be welding to lca for the front link. Im worried there to small and weak.
http://www.summitracing.com/parts/AAF-ALL60025/
http://www.jegs.com/i/Jegster/550/40720/10002/-1

Bracket to be welded to axle for mounting back of link.
http://www.summitracing.com/parts/LCK-L7-1088/
http://www.jegs.com/i/Jegster/550/40784/10002/-1

Rod ends for the ladder bar links. Also should I use teflon lined rod ends or metal to metal ones?
http://www.summitracing.com/parts/SUM-MAXL10T/
http://www.summitracing.com/parts/SUM-MAX10T/

Im trying to find brackets that will work that I dont have to make at home. I wondering what you guys think about trying to make that mini ladder bar setup out of the parts I have above any advise or ideas are welcomed.

Last edited by mtuggle86; 01-30-2011 at 04:45 AM.
Old 01-30-2011, 05:20 PM
  #2  
TECH Enthusiast
Thread Starter
iTrader: (7)
 
mtuggle86's Avatar
 
Join Date: Jul 2008
Posts: 548
Likes: 0
Received 0 Likes on 0 Posts
Default

bump any help?
Old 01-30-2011, 06:02 PM
  #3  
Launching!
 
jim ravencraft's Avatar
 
Join Date: Sep 2009
Location: SOUTH CAROLINA
Posts: 260
Likes: 0
Received 0 Likes on 0 Posts
Default

Hi,
you can fabricate anything with time and effort. Make sure the rear is plumb. We use a plumbline attach a weighted string from control arms/allow to hang freely. Take measurements from three points on each side (same area)
make notes and mark with permanent marker. Dummy/dry fit new rear to the aforementioned measurements.we use foam board to make our templates to exact measurements.measure two/three times and double check. Easier to repair foam than steel. Take your time and triangulate everything you do.
This will assure center and proper alignment of parts. Be patient as this will take time/no frustration or mistakes if you follow proper build procedures.
Check off items as you complete your work.........have a blessed day..... ALWAYS USE PROPER SAFETY PRECAUTIONS...jim
Old 01-30-2011, 06:39 PM
  #4  
12 Second Club
iTrader: (91)
 
MUSTANGBRKR02's Avatar
 
Join Date: Aug 2006
Location: Maine
Posts: 4,599
Likes: 0
Received 5 Likes on 4 Posts

Default

That all looks good. I would just order some DOM tubing and threaded inserts then make my own tubes so you can ensure length
Old 02-01-2011, 03:06 PM
  #5  
TECH Enthusiast
iTrader: (18)
 
massconfusion's Avatar
 
Join Date: Jan 2007
Location: the chi/ addison Il
Posts: 541
Likes: 0
Received 0 Likes on 0 Posts

Default

well the dom tubing you have listed is aluminum so i would advise against that and use steel dom tubing. one being steel is obliviously much stronger and number 2 aluminum must be tig welded. besides that looks good




All times are GMT -5. The time now is 12:01 PM.