Quick ? On head bolt tty
#1
![Default](https://ls1tech.com/forums/images/icons/icon1.gif)
I'm putting on 317 heads with a 6.0l head gasket on a ls1. I'd did the first to 22ft/lbs and then 90degrees on bolt 1-10. Then another 90 degrees on bolts 1-8. The 55 degrees on bolts 9-10.
Is this still right way to do this? Cause it wasn't that hard to do and I could probably move them more. 9-10 bolt I know I can move more.
So at start - 90 | 90 - 9-10bolts 55 /
This right?
Is this still right way to do this? Cause it wasn't that hard to do and I could probably move them more. 9-10 bolt I know I can move more.
So at start - 90 | 90 - 9-10bolts 55 /
This right?