How long does a nitrous install take?
I am wondering how many days to set aside to do this, (not counting tuning).
for a good quality job 2 days is a good time taking your time ofcourse and not hurrying....
i still need to clean up my wiring and relays locations
Trending Topics
The Best V8 Stories One Small Block at Time
............then I realized I didn't hook my brake booster hose back up....

My car ran exactly the same with the plate. Helluva lot faster once nitrous started flowing through it though.

I worked on my system for a LONG time, but it came out perfect. I have a lot of stuff though (FJO progressive, plate kit, purge, ashtray switch, lean shutdown switch, bottle heater, and I installed a whole new fuel system). If you take your time and take some pride in it, it will be all worth it in the end. If you rush through it and throw it together, you won't be so happy and people will be less than impressed.
Time spent is a function of how clean and detailed you want the install to be.
I would estimate at least 2 (8) hour days for the first time installer on a quality well thought out install; this would include solder and shrink wrap over just using crimp connections, pulling the seats and uphostery/consoles for routing/hiding wires etc...
Like Beer said, Have a plan on how you want to attack the install and take your time. I think you will take at least 15-20 hours on your install because you have to do a pump
Time spent is a function of how clean and detailed you want the install to be.
I would estimate at least 2 (8) hour days for the first time installer on a quality well thought out install; this would include solder and shrink wrap over just using crimp connections, pulling the seats and uphostery/consoles for routing/hiding wires etc...
+1
This took me 2 days.


He wanted the noids here so I made custom brackets:

Window/WOT switch:

Thanks Nitrous Outlet

This took longer









