'71 Chevelle - LS1/T56 - In progress

http://www.sealsit.com/grommet_split.asp
Everything seems to be coming along, and your work looks great! Keep up the good work, your almost there!
Ron
thanks

http://www.sealsit.com/grommet_split.asp
The car will be running by Thanksgiving that has always been my deadline. The question is which one.
The Best V8 Stories One Small Block at Time
I then missed my April 06' date (again).. then I missed my Aug 06 for Hot August Nights.. but I finally made it by X-mas 06'....!
I have been egg'in and Raggin on Stealth since he 1st missed his 1st Thankgiving date LOL... But its all good.. I keep watch for his updates... and expecting he to be done soon.
Brake lines and clutch finished.
Body work will start after it's running and drivable.
Inner fender is barely touching. I'll move things a little to leave a gap.
Clutch reservoir.
http://www.carshopinc.com/advanced_s...ls%20it/page/2
I mounted the fuse panel for my AAW wiring harness. I didn't want to bolt through the firewall since I shaved it, so I welded a couple bolts to the inside to mount the fuse panel on.
No more glass tube fuses.
Last night I got the in-tank plumbing finished for the fuel system. I added a 255lph Walbro, -8AN Supply/-6AN Return bulkheads and changed the return tube from 5/16" to 3/8". The Impala tank was originally 3/8" supply 5/16" return. The way I set things up I should be able to add an additional pump if needed down the road.
So at this rate I might finally get it running in 2008.









