Suspension & Brakes Springs | Shocks | Handling | Rotors

Roll Bar

Thread Tools
 
Search this Thread
 
Old 03-07-2006, 10:12 PM
  #1  
TECH Apprentice
Thread Starter
iTrader: (2)
 
Cbrakllr's Avatar
 
Join Date: May 2005
Location: Jupiter, Florida
Posts: 318
Likes: 0
Received 0 Likes on 0 Posts
Default Roll Bar

I was wondering how much it would cost to have an 8 point weld-in cage welded? I was looking at the bolt-in but it would still have to be welded so why not do all welded? Does anyopne have an idea of how much it will cost? Thanks.
Old 03-07-2006, 10:16 PM
  #2  
LC
TECH Resident
 
LC's Avatar
 
Join Date: May 2005
Location: 8000DA Land
Posts: 983
Likes: 0
Received 0 Likes on 0 Posts

Default

by a recent thread...

100usd per point on a quality place...
Old 03-07-2006, 10:31 PM
  #3  
TECH Apprentice
Thread Starter
iTrader: (2)
 
Cbrakllr's Avatar
 
Join Date: May 2005
Location: Jupiter, Florida
Posts: 318
Likes: 0
Received 0 Likes on 0 Posts
Default

So your telling me after I spend $500 for a cage that I need to spend another $800 just to get it welded in? Damn, looks like I aint getting a cage anytime soon.
Old 03-07-2006, 10:43 PM
  #4  
LC
TECH Resident
 
LC's Avatar
 
Join Date: May 2005
Location: 8000DA Land
Posts: 983
Likes: 0
Received 0 Likes on 0 Posts

Default

ironic ah? hahaha
Old 03-08-2006, 07:16 AM
  #5  
TECH Senior Member
iTrader: (14)
 
mitchntx's Avatar
 
Join Date: Nov 2001
Location: DFW, Texas
Posts: 6,480
Likes: 0
Received 2 Likes on 2 Posts

Default

$1300 for an 8 point sounds freaking CHEAP!

I spent $1700 for a 6 point and NASCAR style door bars.

But then again, I wasn't installing it to just satisfy tech inspection. I wanted something that would help protect me.
Old 03-08-2006, 11:46 AM
  #6  
TECH Apprentice
Thread Starter
iTrader: (2)
 
Cbrakllr's Avatar
 
Join Date: May 2005
Location: Jupiter, Florida
Posts: 318
Likes: 0
Received 0 Likes on 0 Posts
Default

So what if I went with a bolt-in cage? I know I would have to get the main hoops welded but that would only be like $200, correct? Then eventually when I have more money I could get it welded in, right?




All times are GMT -5. The time now is 08:33 PM.