New Shop
#1
New Shop
After many months of looking,preparing ect I'm anouncing some changes.Dez Racing is going back to Ford and I'm going GM.In a few days the Dez banner will be down and my new company will be in it's place.
I'm very excited to share our new plans and building.The shop now will be in Bridgewater industrial park (2-3 miles off Rt24)(5 minutes from my house). It is a brand new building and our space is 3500 sq/ft with a nice office space with couch,tv ect,engine building room,2 long bays with 1 holding 2 lifts and the other having 1 lift and Dyno.Also plenty of storage space to make sure the shop is clean.
The new shop name is Slowhawk Performance - www.slowhawkperformance.com . Grand opening will be Oct. 1st.
A special thanks goes out to Marcel,Keith and Josh for the help they've been and I'm sure future help with the shop.
Here are a few pics in the state it's in now -nothing done yet. Next month we will be transforming into the shop we want/need.
Thanks
Don
I'm very excited to share our new plans and building.The shop now will be in Bridgewater industrial park (2-3 miles off Rt24)(5 minutes from my house). It is a brand new building and our space is 3500 sq/ft with a nice office space with couch,tv ect,engine building room,2 long bays with 1 holding 2 lifts and the other having 1 lift and Dyno.Also plenty of storage space to make sure the shop is clean.
The new shop name is Slowhawk Performance - www.slowhawkperformance.com . Grand opening will be Oct. 1st.
A special thanks goes out to Marcel,Keith and Josh for the help they've been and I'm sure future help with the shop.
Here are a few pics in the state it's in now -nothing done yet. Next month we will be transforming into the shop we want/need.
Thanks
Don
#3
LOL, I don't think anything could be harder than what I just went threw between all bussiness setup,insurance company's,banks ect in a 2 week period. I gave myself a month for shop setup.Lift company is ready to come in,then floor epoxy and the rest is setup.I need it done in that month since Oct. is pretty much booked already.
#6
Banned
iTrader: (15)
LOL, I don't think anything could be harder than what I just went threw between all bussiness setup,insurance company's,banks ect in a 2 week period. I gave myself a month for shop setup.Lift company is ready to come in,then floor epoxy and the rest is setup.I need it done in that month since Oct. is pretty much booked already.
I did my epoxy first then my lifts. Much easier than goin around them.
Trending Topics
#11
TECH Fanatic
Join Date: Nov 2001
Location: Yarmouth, MA
Posts: 1,684
Likes: 0
Received 0 Likes
on
0 Posts
awesome Don!! just remember to tell me when the grand opening party is
the only shitty thing is... now you have a HUGE excuse to buy every and all tools. Can't wait to see it all done.
the only shitty thing is... now you have a HUGE excuse to buy every and all tools. Can't wait to see it all done.
#13
LS1TECH Sponsor
Join Date: Dec 2001
Location: I'm glad one of us finds this amusing...
Posts: 3,310
Likes: 0
Received 0 Likes
on
0 Posts
Congrats man!! I've been busting at the seams keeping all the new shop announcements to myself!
It's been a long time coming, and I'm glad to help out anyway I can!
It's been a long time coming, and I'm glad to help out anyway I can!
#20
TECH Addict
Join Date: Dec 2001
Location: Plainville,MA
Posts: 2,850
Likes: 0
Received 0 Likes
on
0 Posts
Like I said the other day I'm off till Oct 1st, so let me know if U need some help.
Have dually will haul!