*Sneak Peek* TTP's New 4130 Chromemoly SFCs
#1
Banned
Thread Starter
iTrader: (18)
Join Date: Aug 2003
Location: Wayne, NJ
Posts: 2,984
Likes: 0
Received 0 Likes
on
0 Posts
*Sneak Peek* TTP's New 4130 Chromemoly SFCs
We wanted to create a new lightweight subframe connector for the f-body cars. We went for 1.625 x .083 4130 chromemoly round tubing and 3/16" oil hardened steel plates at the ends. This creates a very rigid mounting surface with the lightweight 4130 tubing. This is our first prototype set being tacked in to a customer's car. Oh and just so anyone asks that is our new Candy Apple Red powder coat.
#3
Banned
Thread Starter
iTrader: (18)
Join Date: Aug 2003
Location: Wayne, NJ
Posts: 2,984
Likes: 0
Received 0 Likes
on
0 Posts
Weight: We are finalizing the design right now should have some weights for you by tomorrow if not Thursday.
I am looking to price these around the $150 range. Trying to go with 4130 material and keep it as cost effective as other's mild steel pricing.
I am looking to price these around the $150 range. Trying to go with 4130 material and keep it as cost effective as other's mild steel pricing.
#6
TECH Enthusiast
Join Date: Dec 2006
Location: Powder Springs, GA
Posts: 564
Likes: 0
Received 0 Likes
on
0 Posts
nice....ive been thinking about getting some subframe connectors...when you get prices finalized, i might be contacting you...can you make em in black or would i have to paint them black afterwards???
Trending Topics
#15
Banned
Thread Starter
iTrader: (18)
Join Date: Aug 2003
Location: Wayne, NJ
Posts: 2,984
Likes: 0
Received 0 Likes
on
0 Posts
I will have final weight today. We have a bunch of SFCs made now. We just have to reinvestigate the P/C oven issues we've had and get that squared away. I'm as excited as you all are to get the suspension lines moving but I don't want to sacrifice quality just to get them out fast. My time lines are always off
LCA's, PHR, TQ Arm are all planned within the next month. First is the LCAs/PHR hopefully within 2 weeks.
- Matt
LCA's, PHR, TQ Arm are all planned within the next month. First is the LCAs/PHR hopefully within 2 weeks.
- Matt