Steve68's Camaro.
#581
Thanks on the box, can't wait to put it in the garage and fill it with tools,
I was on my way to TX for a job with Space X, but someone here, screwed it up for me, which and someone there who back doored there way back to FL, which ended my chance for a job there, was really interested in coming to TX!!!
I was on my way to TX for a job with Space X, but someone here, screwed it up for me, which and someone there who back doored there way back to FL, which ended my chance for a job there, was really interested in coming to TX!!!
#586
I can help, pull what ever is in there and sell it!!! lol
lots of info all over make a plan, stick with it, don't try to keep up with the Jones, and you'll be driving before you know it,
Thanks for the words, check back, I'll be working on it and posting pics soon enough,
lots of info all over make a plan, stick with it, don't try to keep up with the Jones, and you'll be driving before you know it,
Thanks for the words, check back, I'll be working on it and posting pics soon enough,
#587
So true! I planned,sourced, and budgeted once then saw a few cars where they have a larger bank roll than myself which made me want to blow out my budget!
Side note: Thought I found my donor car on Craigslist for $2500 but turned out to be an automatic car. Hope I find one by spring!
Side note: Thought I found my donor car on Craigslist for $2500 but turned out to be an automatic car. Hope I find one by spring!
#591
hell no, but there's working going on in my head garage, planning etc, looking at headers, cause I have none, Scott says the Hooker swap header fit the sub best, so..
I was looking at the headers on here ARG or something, but guys abandon his post,
so the plan is to get it in the shop, get the sub under it, get it on the lift, then look at welding in the rear, but it might go to Screaming Performance to get the G Link modified to sit at the lower ride and get welded in, then spray the underneath with epoxy bed liner, so I'm in the planning stage ideas... whoo hoo, ideas and spending money..
I was looking at the headers on here ARG or something, but guys abandon his post,
so the plan is to get it in the shop, get the sub under it, get it on the lift, then look at welding in the rear, but it might go to Screaming Performance to get the G Link modified to sit at the lower ride and get welded in, then spray the underneath with epoxy bed liner, so I'm in the planning stage ideas... whoo hoo, ideas and spending money..
#598
Just got a call from the installer, there in town to start building on Sunday, but they need a scissors lift, and all the Sunbelts are closed for the weekend, wait, not the ones 20 miles away, gotta go,