Exact procedure for installing 9" axles
add Backing plate(ensure it is for the correct side)
add bearing
add bearing retaining ring
Install oil seal in housing
Slide the correct axle assembly into the housing
Trending Topics
The Best V8 Stories One Small Block at Time
The order above is also what we used on my 4 channel 9" Moser axle for my 1998 Z28. First you need to have ABS reluctor ring pressed on, then the backing plate goes next (make sure it's facing the correct side and for the correct axle, *it just sits loose so no pressing), then the bearing (make sure it's facing the correct side), and last the thick press ring. We actually used the press ring to press on the bearing. Apparently, it's easier to press them on one at a time.
Here's a picture. You can't see the thick press ring because it's inside the housing end.
Does the backing plate slide over the bearing?
2) I recall my buddy Ryan putting the backing plate on before pressing the bearing on the axle.

