Hub failures?
#22
The fact that I can make a Timken have slack on the left front after two days(8 sessions) on track on NT-05 tires. Slack starts after the first day on track.
The MOOG now has 6 days (24 sessions) on the left front with almost no slack very very little almost not noticeable at all. 16 of those sessions were run on a Rcomp(slick) tire.
The MOOG in the right front has 2 days(8 sessions) with no slack at all on Rcomp tires.
This is the best bearing I have found so far.
The MOOG now has 6 days (24 sessions) on the left front with almost no slack very very little almost not noticeable at all. 16 of those sessions were run on a Rcomp(slick) tire.
The MOOG in the right front has 2 days(8 sessions) with no slack at all on Rcomp tires.
This is the best bearing I have found so far.
I have yet to track my car but have certainly built my car with the idea that I'll be tracking it on a fairly regular basis.