Mini tub time
#23
Teching In
Thread Starter
Join Date: Jan 2009
Location: Augusta Georgia
Posts: 34
Likes: 0
Received 0 Likes
on
0 Posts
the rear is the last thing i need to replace but also the most $ i needed to do the mini tub before the rear end si i will know exactly what i need to order. but this is what i have done so far. kyb shocks front/rear, new cross drilled slotted rotors front, subframe cons., new motor, new cooling system, new bg fuel dilevery system, used drop spindles front (they dont make drop spindles for my car anymore), new lowering springs, new control arms, new panhard bar, new transmission, new crossmember with torque arm and loop, new roll cage, new seats, new gauges, new door panels, new exhaust, new wheels, new tires, new fuel cell,new ram air hood, new paint. so thanks for pointing out the one thing that is not new trying to be a dick but i think that would be pretty much everything. sorry if this seems harsh but it seems everytime someone has a post someone else haves to come alog and shoot them down in some way.