Jegs 8 Point Roll Cage install *pics!*
Trending Topics
#16
Teching In
Thread Starter
iTrader: (4)
Join Date: Mar 2007
Posts: 20
Likes: 0
Received 0 Likes
on
0 Posts
![Default](https://ls1tech.com/forums/images/icons/icon1.gif)
Nope didn't have to drop the tank. It took about 8-10 hrs to get everything measured, fitted, cut, welded, cleaned up and painted, spread out over about a week and half. I'm an amatuer welder so I took a lot longer to make sure the welds were good. Could take an expirienced person a lot less time. And price was like he said 275 shipped, got here two days later. Used VHT Epoxy Paint if anyone wants to know, got it from the local advance auto parts(were I work).