SFI 25.2 Mustang/LSx build "The Renegade"
#3642
![Default](https://ls1tech.com/forums/images/icons/icon1.gif)
Jesel has the belt drives available for any ls engine. The lifters are also in stock may need to be assembled. Call Shawn from VaSpeed hes a Jesel dealer.
#3645
Teching In
Join Date: Jan 2008
Location: Greencastle, PA
Posts: 20
Likes: 0
Received 0 Likes
on
0 Posts
#3646
![Default](https://ls1tech.com/forums/images/icons/icon1.gif)
Ever thought of going with a Winberg? I know a couple guys that swear by their custom stuff. I don't know if they make a center weighted crank or not though. That's what you're using, right?
#3648
#3649
![Default](https://ls1tech.com/forums/images/icons/icon1.gif)
Winberg does make one. They can do a center weighted in a 4.650 stroke off the current billet core they have now. I got mine from them and can't say a bad thing. Mine took right at 11 weeks from start to finish. If you want a top of the line crank I would only use 3 people. Winberg, Bryant or Pankl ( SP Crankshafts ) and that is it.
#3650
![Default](https://ls1tech.com/forums/images/icons/icon1.gif)
Winberg does make one. They can do a center weighted in a 4.650 stroke off the current billet core they have now. I got mine from them and can't say a bad thing. Mine took right at 11 weeks from start to finish. If you want a top of the line crank I would only use 3 people. Winberg, Bryant or Pankl ( SP Crankshafts ) and that is it.
![Icon Lol](https://ls1tech.com/forums/images/smilies2/icon_lol.gif)
#3651
FormerVendor
iTrader: (3)
Join Date: Jun 2007
Location: Virginia Beach,Virginia
Posts: 2,991
Likes: 0
Received 2 Likes
on
2 Posts
![Default](https://ls1tech.com/forums/images/icons/icon1.gif)
we're right at 15 weeks right now. kinda irritating. Got 5 cranks on order from Bryant and this is the best service i get.
Winberg makes some great cranks, got a couple big block cranks of theirs sitting here.
Winberg makes some great cranks, got a couple big block cranks of theirs sitting here.
#3657
![Default](https://ls1tech.com/forums/images/icons/icon1.gif)
It just always never fails when you order stuff for these type of builds. 4 weeks is really 10 and 12 is 20.
Shawn
You should call over to Winberg and speak to Randy Winberg. Tell him I sent you over. I can even get you in contact with him if you like. They have really nice stuff.