All new Diamond Adjustable Master cylinders TEASER!
#65
TECH Addict
iTrader: (11)
Not sure why one would let their undies get all up in a bunch for something that might not even be of existence. Its not like theres not good MC options already. Especially when this was just recently posted:
Its clear that from that statement there isnt even a prototype yet.
It seems like its always something holding me up on things like this. I'm hoping to test it in my 98 SS. It would be really easy to install since the motor is out
If I don't hear something from my machinist really soon, then I have a back-up shop lined up. I'll do what it takes to get this part made, and the others.
If I don't hear something from my machinist really soon, then I have a back-up shop lined up. I'll do what it takes to get this part made, and the others.
#66
FormerVendor
Thread Starter
iTrader: (23)
Join Date: Aug 2003
Location: Fort Worth, TX
Posts: 800
Likes: 0
Received 0 Likes
on
0 Posts
Update:
This project is still in the works, and was on the back burner. I should have never posted this thread, honestly. I thought at the time, that I'd have a product somewhat quickly. But, as you can see, that never happened. It is a LOT harder than anyone would think just to find a CNC machine shop that is willing to really work with you and be reasonable. I've gone thru about 5-6 shops who kept leading me on, and it was one thing after another. Well about 5 months ago, I finally I found a good local CNC shop. I have about 10 things on my list to be produced and put out onto the market. Some of which have a higher priority than the master cylinder. For example, T56 upgraded parts (billet shift pads, keys, etc). We are on the last item right now (billet 1-2 keys). Once I have a stock pile of all the T56 parts, I will start on the master. So we are maybe 4-6 weeks out on it at the moment. Don't hold me to this, as I will only post AFTER it is done. I will not give any ETAs or any more info about it until it is tested out and ready.
-Jason
This project is still in the works, and was on the back burner. I should have never posted this thread, honestly. I thought at the time, that I'd have a product somewhat quickly. But, as you can see, that never happened. It is a LOT harder than anyone would think just to find a CNC machine shop that is willing to really work with you and be reasonable. I've gone thru about 5-6 shops who kept leading me on, and it was one thing after another. Well about 5 months ago, I finally I found a good local CNC shop. I have about 10 things on my list to be produced and put out onto the market. Some of which have a higher priority than the master cylinder. For example, T56 upgraded parts (billet shift pads, keys, etc). We are on the last item right now (billet 1-2 keys). Once I have a stock pile of all the T56 parts, I will start on the master. So we are maybe 4-6 weeks out on it at the moment. Don't hold me to this, as I will only post AFTER it is done. I will not give any ETAs or any more info about it until it is tested out and ready.
-Jason