my 81 notch LSx swap project...
#141
Originally Posted by Lane
I used Mac 351 swaps, but i did have to re-route 1 primary on the drivers side - to clear the steering shaft, and maybe two on the passenger side, to clear the K-member. It was a QA1 K-member.
Can't remember exactly - it's been about four years.
Can't remember exactly - it's been about four years.
#143
Oh yeah whats the thickness on those mount spacers? Are they just washers? If so what type and how many? Im going to have spacer made at work. Steel or aluminum not sure yet. You want a set?
#144
ah, didnt even see the link... thanks.
for spacers, i just used washers - i think it was 3/8in i had to space it up, and yeah id LOVE a set!!!!
my goal is to have the car atleast running by the end of august, i basically have to finish the wiring, do the fuel system, build the rear, make some sort of intake, get a driveshaft, put my interior back together, and get an exhaust made.
for spacers, i just used washers - i think it was 3/8in i had to space it up, and yeah id LOVE a set!!!!
my goal is to have the car atleast running by the end of august, i basically have to finish the wiring, do the fuel system, build the rear, make some sort of intake, get a driveshaft, put my interior back together, and get an exhaust made.
#146
Originally Posted by lt4malibu
so i should have the 8.8 together so i can do the rear suspension
#152
Originally Posted by rss0694
I just spoke to George at KOOKS. He said $693,They are mild steel and they need 2-3 weeks to make them.
A pre-made bolt in K, and bolt in headers... Man, life is good for the Fox/LSX swap now. Not like 4 years ago.
#154
some more progress:
wiring is almost finished up, just need to neaten it up and cover it up. dash is all wired, took alot of unnecessary wiring out of the car. also got a ton of parts just waiting to go on(the closet in my apartment is literally overflowing ) headers should be back from getting coated this week. and im hoping ill be atleast be able to start it up by the end of the month.
heres some pics:
dash all lit up, all gauges working (even the exterior lights work lol)
shiftlight hidden in the a/c vent
cannibalized LT1 harness to get some of the proper color wires
everything all separated, ready to be hooked up
wiring is almost finished up, just need to neaten it up and cover it up. dash is all wired, took alot of unnecessary wiring out of the car. also got a ton of parts just waiting to go on(the closet in my apartment is literally overflowing ) headers should be back from getting coated this week. and im hoping ill be atleast be able to start it up by the end of the month.
heres some pics:
dash all lit up, all gauges working (even the exterior lights work lol)
shiftlight hidden in the a/c vent
cannibalized LT1 harness to get some of the proper color wires
everything all separated, ready to be hooked up
#156
Wow, with Kooks on-board to do a swap header, that makes things a LOT easier.
I know I'm planning on doing this swap before summer 08 and this thread will be a lot of help. Major, MAJOR props to you, lt4malibu.
I know I'm planning on doing this swap before summer 08 and this thread will be a lot of help. Major, MAJOR props to you, lt4malibu.
#158
Originally Posted by TroubledWine3
Wow, with Kooks on-board to do a swap header, that makes things a LOT easier.
I know I'm planning on doing this swap before summer 08 and this thread will be a lot of help. Major, MAJOR props to you, lt4malibu.
I know I'm planning on doing this swap before summer 08 and this thread will be a lot of help. Major, MAJOR props to you, lt4malibu.
Originally Posted by bugmenot1
when will the production swap header be available