1SC stripper build
#71
Not much happening till next month.
All rearend parts that need to powdercoated are ready and waiting to be sent in, then it will be assemble and installed.
Have been working with Andy at Finishline Transmission and if every works out, I will a Level 6 or 7 4l60e at the end of September.
All rearend parts that need to powdercoated are ready and waiting to be sent in, then it will be assemble and installed.
Have been working with Andy at Finishline Transmission and if every works out, I will a Level 6 or 7 4l60e at the end of September.