Backhalf Project Started. Pic inside
#68
![Default](https://ls1tech.com/forums/images/icons/icon1.gif)
Originally Posted by JPMuscle
Lookn good.
hey what brackets are you guys all using, I need to order mine up and cant decide which ones to get.
thanks,
-john
hey what brackets are you guys all using, I need to order mine up and cant decide which ones to get.
thanks,
-john
#69
TECH Enthusiast
Join Date: Apr 2005
Location: Jamestown, NY
Posts: 680
Likes: 0
Received 0 Likes
on
0 Posts
#72
TECH Enthusiast
Join Date: Apr 2005
Location: Jamestown, NY
Posts: 680
Likes: 0
Received 0 Likes
on
0 Posts
![Default](https://ls1tech.com/forums/images/icons/icon1.gif)
Originally Posted by 6techniques
Looking good guys!
Now how exactly do you secure the floorpanels....Do you weld them to the subframe/backhalf rails? Or do you somehow bolt them down?
![Chug! Chug! Chug!](https://ls1tech.com/forums/images/smilies/LS1Tech/gr_chug.gif)
Now how exactly do you secure the floorpanels....Do you weld them to the subframe/backhalf rails? Or do you somehow bolt them down?
depends if thier gona be Aluminum or steel. Mine will be Steel and their for welded in.
#75
TECH Enthusiast
Join Date: Apr 2005
Location: Jamestown, NY
Posts: 680
Likes: 0
Received 0 Likes
on
0 Posts
![Default](https://ls1tech.com/forums/images/icons/icon1.gif)
Originally Posted by 9sec93
mine is aluminum and rivetted in place except for the panel between the wheel tubs above the 4 link bars, that us removable with dzus fasteners. it is nice to be able to make 4 link adjustments from inside the car.
what size tires were you runnin again, I forgot what you told me lol
#76
![Default](https://ls1tech.com/forums/images/icons/icon1.gif)
Yeah they weld in, I'll post some more pics tomorrow. The cage and sheetmetal are done now. The bars that go out to the front of the car weren't any fun. All that is left is
seam sealer
paint
install chute
install wheelie bars
install lexan windshield
finish headers
plumbing
wiring
the list has finally gotten shorter.
seam sealer
paint
install chute
install wheelie bars
install lexan windshield
finish headers
plumbing
wiring
the list has finally gotten shorter.
#77
TECH Enthusiast
Join Date: Apr 2005
Location: Jamestown, NY
Posts: 680
Likes: 0
Received 0 Likes
on
0 Posts
![Default](https://ls1tech.com/forums/images/icons/icon1.gif)
Originally Posted by Tim King
Yeah they weld in, I'll post some more pics tomorrow. The cage and sheetmetal are done now. The bars that go out to the front of the car weren't any fun. All that is left is
seam sealer
paint
install chute
install wheelie bars
install lexan windshield
finish headers
plumbing
wiring
the list has finally gotten shorter.
seam sealer
paint
install chute
install wheelie bars
install lexan windshield
finish headers
plumbing
wiring
the list has finally gotten shorter.
I wish my list was that short
![Cry](https://ls1tech.com/forums/images/smilies/LS1Tech/gr_cry.gif)
Im not looking forward to doing the sheetmetal work at all.
#78
![Default](https://ls1tech.com/forums/images/icons/icon1.gif)
Originally Posted by JPMuscle
I wish my list was that short
Im not looking forward to doing the sheetmetal work at all.
![Cry](https://ls1tech.com/forums/images/smilies/LS1Tech/gr_cry.gif)
Im not looking forward to doing the sheetmetal work at all.