Jet-Hot Coated CTSV Header Sale!!!
#1
FormerVendor
Thread Starter
Join Date: Mar 2010
Location: North Carolina, Oklahoma, and Arizona
Posts: 130
Likes: 0
Received 0 Likes
on
0 Posts
Jet-Hot Coated CTSV Header Sale!!!
We Are At It Again!
Pacesetter CTSV $450 Coated in Sterling or $475 in our Extreme Sterling with a Group Purchase of 10.
•1-3/4" Primary Tubes with 3" Collectors.
•CNC-machined 3/8"-thick steel flanges.
•Flash-controlled 16-gauge carbon steel primaries provide greater durability than light gauge stainless steel.
•Length and diameter of mandrel-bent tubing is optimized for flow and best performance increase.
•Tubes enter collector in proper sequence for maximum scavenging.
•O2 sensor fittings on all applications.
•Complete with necessary gaskets and fasteners for installation.
•Made in USA!
Generally 1-2 weeks to ship then 3-5 days for JET-HOT Coating.
Be the first to review this product!
Headers do require extensions for install, although at this time Pacesetter is not in production with these parts. They should be on the market in or around 6-8 weeks. Shipping included covers only Continental US to exclude Alaska and Hawaii.
Pacesetter CTSV $450 Coated in Sterling or $475 in our Extreme Sterling with a Group Purchase of 10.
•1-3/4" Primary Tubes with 3" Collectors.
•CNC-machined 3/8"-thick steel flanges.
•Flash-controlled 16-gauge carbon steel primaries provide greater durability than light gauge stainless steel.
•Length and diameter of mandrel-bent tubing is optimized for flow and best performance increase.
•Tubes enter collector in proper sequence for maximum scavenging.
•O2 sensor fittings on all applications.
•Complete with necessary gaskets and fasteners for installation.
•Made in USA!
Generally 1-2 weeks to ship then 3-5 days for JET-HOT Coating.
Be the first to review this product!
Headers do require extensions for install, although at this time Pacesetter is not in production with these parts. They should be on the market in or around 6-8 weeks. Shipping included covers only Continental US to exclude Alaska and Hawaii.
Trending Topics
#9
FormerVendor
Thread Starter
Join Date: Mar 2010
Location: North Carolina, Oklahoma, and Arizona
Posts: 130
Likes: 0
Received 0 Likes
on
0 Posts
#10
FormerVendor
Thread Starter
Join Date: Mar 2010
Location: North Carolina, Oklahoma, and Arizona
Posts: 130
Likes: 0
Received 0 Likes
on
0 Posts
IF that is what they are telling you I am pleased to hear that. Although in speaking with the VP of production at pacesetter we are still being told it will be 6 weeks at the earliest those parts go into production.
#18
FormerVendor
Thread Starter
Join Date: Mar 2010
Location: North Carolina, Oklahoma, and Arizona
Posts: 130
Likes: 0
Received 0 Likes
on
0 Posts
We Order Right From Pacesetter, as long as they have them in stock they ship direct to us it takes us 3-5 days for our coating process and then we ship out to you. IF Pacesetter is out of stock then it could be 3-4 weeks before you see your parts.
#20
FormerVendor
Thread Starter
Join Date: Mar 2010
Location: North Carolina, Oklahoma, and Arizona
Posts: 130
Likes: 0
Received 0 Likes
on
0 Posts
From what Pacesetter tells me the headers are instock. The connectors are not and they are not on the schedule to be made anytime soon. I know everyone keeps posting what they have been told but you are looking at around 6-8 weeks on those. Most of the guys I had in this group purchase opted to have their own made. Although that purchase has ended I have opened it for a few others that got in late and would be happy to extend it to you as well if you would like to order.